Project 1:300KW wind turbine system in Inner Mongolia
Provider: Wuxi Smaraad New Energy Technology Co., Ltd
Service item: Design + Construction + Installation one-step service
Site address: Xilinhot,Inner Mongolia
Position:Local geographic coordinates:116°08' east longitude, 43°93' north latitude
Advantages: Installed with 20m Pole,combined 300kw wind turbine,10pcs. In total 3Mwh per hour. Now could meet the power for Farm within 10km.
Project 2:100KW wind turbine and 50kw solar hybrid system in Tibet
Provider: Wuxi Smaraad New Energy Technology Co., Ltd
Service item: Design + Construction + Installation one-step service
Site address: Xilinhot,Inner Mongolia
Position:Local geographic coordinates:83°08' east longitude, 26°93' north latitude
Advantages: Installed with 30m Pole,combined 100kw wind turbine,5pcs. In total 500kwh per hour. Now could meet the power for the town within 10km.