Wind Power

SMARAAD New Energy has many years experience in the wind energy industry.

No matter you are used for a utility, commercial, industrial or personal household, we can provide the best solutions for you upon your requirement.

Our wind energy projects are committed to build a clean energy environment for global customers in the future.

Contact Us

Solar Power

The sunlight that shines on the Earth in just one hour could meet world energy demand for an entire year! Since 2000, solar energy has achieved tremendous development, laying the foundation for the ever-evolving clean energy future. Chinese newly installed photovoltaic power generation capacity ranks Top1 in the world for five consecutive years, and its cumulative installed capacity ranks TOP 1 in the world for three consecutive years.

In order to bring a sustainable energy to the world, SMARAAD provides all kinds of customized solar solutions for customers and communities.

Contact Us

Wind&Solar System

No matter it is grid tied system or off-grid system of wind energy, solar energy, or a hybrid system Even on and off grid hybrid system, SMARAAD technician team has a rich experience and technology to design and provide best solutions that can adapt to various application for our customers.

Contact Us

Energy Storage System

The sun doesn’t always shine and the wind doesn’t always blow!Those are often seen as an impediment to renewable energy. But it’s also led to ways of discovering how to store those energy until it’s needed.

Based on our experience and technology,We can add storage system to your facility as a stand alone system.

Contact Us
Extended validation and certification of Ingeteam’s new-generation power converters reduces the cost of energy
发表时间:2020-11-24     阅读次数:

详细介绍

The response is focused on increasing the reliability and durability of these components, making wind turbines more economically viable assets. High quality design and extended validation methods of power converters are key to guarantee the reliability and durability of the turbines in wind farms facing the toughest operating conditions.

Ingeteam’s new-generation power converters have been validated using the toughest test scenarios and most realistic configurations, to prove in advance that the converter will be properly integrated within the turbine and operate correctly under the most demanding situations.

The market demands continuous performance improvement and regulatory innovations take this factor into account. Ingeteam participates in the committees which issue these requirements and integrates the latest regulatory developments at the design phase of the company’s new generation power conversion solutions.

This method is also applied to the company’s manufacturing plants to comply with all marking requirements. Indeed, the certification of the converter facilitates the certification process for the whole wind turbine.

New-Generation Power Converters developed for High Power DFIG Application

To this day, DFIG converters remain the most proven, efficient and cost competitive drive train topology for onshore applications. Ingeteam’s DFIG converter series offer cost-optimized products for each market and application. Our wind converters are extremely grid-friendly, and include FRT, SCR and SSR features, enabling them to be deployed anywhere in the world. In particular, they are very well suited to emerging markets such as India or Brazil.

Our DFIG converters can be modulated to bring customized solutions that will effectively minimize wind turbine LCoE. Ingeteam’s vast knowledge and experience have been mobilized to generate design processes that combine development and validation, to ensure the supply of optimized DFIG Power Converters in the wind market for high power applications in the range of 6 to 8 MW.

Because of the application’s particularities, the grid integration of the system is one of the most sensitive elements to keep the technology competitive and reliable while increasing the turbines’ rated power. DFIG generators and the core components of the converter are the key factors that ensure a robust and reliable solution regarding the various grid events that could occur, such as harmonic fulfilment, FRT, weak grids or SSR. The capability of managing these events in virtually all locations is a key added-value that Ingeteam has successfully achieved, with a high-quality model correlation that allows analyzing any event or location that could arise in the future.

Validation process

As a critical wind turbine component, Ingeteam’s new-generation power converters must meet the highest quality requirements for wind turbine performance is dependent upon them.

Ingeteam’s new power conversion solutions have been subjected to the tests required by IEC61400 for wind turbines, and IEC62477-1 and IEC61800-3 for power converters, verifying the correct performance and the highest level of safety.

Within this validation process, a large number of tests are focused on the assessment of energy and temperature hazards. For example, the behaviour of the converter in the event of failure of a cooling system or insulation components is assessed by means of functional tests, simulating these failures or in temperature rise tests. In addition, mechanical tests such as IP degree, corrosion, impact, or vibration also form part of the validation. All these tests guarantee the safety and the correct performance of the power conversion solutions.

Based on its experience in the wind turbine market, Ingeteam considers that an “extended validation” of power converters is appropriate in order to optimize the design and minimize any potential issues that may arise during the integration of the component within the wind turbine.

The objective of this “extended process of validation” can be summarized as follows:

  • To identify design improvements or detect any design failures of the converter at the earliest stage of development, thereby minimizing subsequent design and manufacturing costs due to modifications at a later stage of implementation that would imply the use of more resources.
  • To test the converter under the most realistic conditions to validate the design under all possible scenarios and to verify it complies with requirements. The more accurate the test is regarding the behaviour onsite inside the turbine, the greater the reliability of the tests and the results obtained.

Ingeteam carries out four types of test to provide accurate data about the behaviour of its converters when installed onsite:

  • Combination tests in full-scale test benches.
  • Extreme climatic condition tests.
  • Extreme mechanical condition tests.
  • Electromagnetic compatibility tests.

Combination Tests in Full-Scale Test Bench

The correct behaviour of a power converter can be verified without the use of a generator by means of external power supplies and passive components; however, this kind of validation process cannot fully guarantee the correct integration in the field.

Specific characteristics of the generator could affect the behaviour of the converter, and combination tests make it possible to anticipate them. Some processes are not possible to simulate and assess by means of calculations, and empirical methods are the best way to do that. In addition, combination tests with power-limited generators or mock-ups may not allow the required points to be assessed.

Ingeteam carried out these tests, using the same generator as in the final application, which is critical.

Final layout of the test bench

Combination tests with a generator at full scale enable the correct performance assessment of the converter at any desired point. Thus, a full validation process is obtained as the converter operates along the whole operation ranges. This process includes at least the following variable parameters including grid voltage and frequency, generator speed, reactive or active power, or temperature.

Extreme Climatic Condition Tests

A critical point of a validation process is the climatic one. To be able to verify empirically the correct behaviour of a converter and its components along the whole climatic range is important in order to detect unexpected behaviours that cannot be predicted by means of calculations. Ingeteam is able to carry out a detailed validation thanks to its test benches which are able to control the temperature and the humidity over a very wide range, and where the converters can operate at rated conditions.

Executing tests at the extreme limits of temperature and humidity allows the observation and understanding of the specific behaviour of components when they operate close to their limit, and to define the best options regarding functionality and cost. Without this empirical analysis, the selection of components would be based on theoretical calculations and datasheets, making a conservative selection that would imply overrun, more likely. With this validation the optimum design is obtained.

Ingeteam climatic (Temp & RH) chamber

In addition, the performance in case of failure can be assessed in detail. Without this kind of test infrastructure, it would be impossible to know how the converter really reacts when a component such as a fan or a cooler fails. The behaviour at a specific room temperature or humidity value could differ drastically from another value. This uncertainty is overcome by carrying out failure tests at several climatic points to identify the real performance at each point without depending on assumptions and calculations that could provide erroneous conclusions and lead to designs that do not fulfil the requirements or could even be dangerous.

The climatic extreme conditions validation includes heat run tests, cold climate tests, full condensation tests and damp heat tests.

Extreme Mechanical Condition Tests

Another critical part of the validation process of the converter for its final application is the assessment of its behaviour and response to low frequency vibrations. Incorrect behaviour could cause severe damage to the converter and the wind turbine.

Depending on the wind turbine, the location of the converter and the fastening structure, the response could change drastically. Thus, this is a process to be carried out for each wind turbine-converter combination.

Vibration test

Prior to the test, Ingeteam develops detailed Finite Elements Models (FEM) to predict the response of the converter and to assess the different design options.

The main test consists in sinusoidal sweeps using the specific “Frequency-Acceleration profiles”. These profiles are defined based on accelerated test processes with the aim of simulating the whole accumulated damage along the life of the turbine in only a couple of hours.

During the tests, the resonances are checked because any change on their frequencies could lead to structural damage.

In addition, shock tests with extreme acceleration values are carried out.

Following these tests, the converter must remain operational. No damage affecting safety can be accepted.

Passing these tests guarantees that the combination of converter and wind turbine is correct and will withstand the lifetime of the turbine. The results are also correlated with the FEM models developed.

Electromagnetic Compatibility Tests

The immunity of the converter against the emissions of the environment or generated by nearby devices is critical to guarantee the maximum availability of the turbine. Also, the converter itself can generate emissions that could affect the correct operation of nearby items (within or outside the turbine). To confirm that the converter is able to operate in an environment within the expected emissions limits, compatibility tests according IEC61800-3 standard are included in Ingeteam’s validation process. These tests are carried out in the manufacturing plant, using the most representative configuration, and by certification bodies.

Passing them minimizes drastically the risk and uncertainty regarding EMC.

Radiated emissions test

Certification Process

Another cornerstone of Ingeteam’s design process is certification. Achieving the combined requirements of maximum durability and reliability with cost-optimization, is essential, but Ingeteam understands that different international standards can present a barrier for wind turbine installation.

Therefore, Ingeteam considers the strictest international standards for all its designs.

Ingeteam participates in the committees that issue these requirements and thus it stays up to date with the latest regulatory innovations and implements them from the design phase of the converter. Being proactive regarding regulatory demands leads to the improvement of new converter designs and avoids late modifications that could delay a project. Any new design within the company integrates the strictest standards for all the applicable marks and labels including CE, UL or DNV-GL.

The participation in IEC committees such as TC22 (Electronic Power Conversion) and TC88 (Wind Energy Generation Systems), IECRE (IEC Renewable Energy), as well as in specific working groups within IEC including WG05 (Hazardous Substance) or WG26 (SW testing), or STP UL groups for development of standards like UL508 (Industrial Control Equipment), proves the commitment of Ingeteam to the quality of its products.

Moreover, this approach is not only applied to product design, but also the manufacture of the products in its plants. For that purpose, the plants are certified for the manufacture of any component and marked with the main wind mark labels. These certifications confirm international compliance and avoid project delays due to any marking regulations and barriers. In addition, they facilitate the certification process of the wind turbine.

Ingeteam has already certified its plants for power converter within DNV-GL and UL scopes, and in addition has been trained for APQP4Wind.

Conclusion

Extended validation of Ingeteam’s new generation of power converters confirms their operational performance under the most severe conditions. The use of full-scale test benches for integration assessment and climatic behaviour evaluation are key to optimize the design and detect potential improvements at an early stage. The information obtained from the tests assures the optimization of the design and guarantees that the converter is going to operate properly in the field.

The incorporation of the latest and most stringent regulatory requirements at the design phase and also in the certification of the manufacturing for plant, allows Ingeteam to facilitate the wind turbine certification process, wherever the geographical location, thereby reducing the project time-to-market and saving costs throughout the development and validation design processes. Clients can be confident that thanks to extended validation, Ingeteam’s new products deliver the best onsite value for money.

CLICK HERE TO LEARN MORE

About Ingeteam Group

Ingeteam is an international technological Group specialized in electric power conversion. Its state of the art developments in power and control electronics (inverters, frequency converters, controllers and protections), rotative electric machines (Indar motors, generators and submersible motor & pumps sets), systems (electromechanical engineering and automation projects), and services (operation & maintenance services), enables it to provide the best solutions in different sectors, namely: wind, solar PV, hydro and fossil fuel power generation; metal and mineral processing; mining; marine; rail traction; waters; e-vehicle charging and power grid automation, always achieving sustainable and efficient energy generation, transmission, distribution and consumption.